Completing the remodels of the Guest Suites and Corridors at the Hotel Rose officially marks the end of Phases 2 and 3. This project utilized a detailed phasing plan and required a great deal of communication with the Hotel’s staff to allow the construction to be successfully completed while the facility remained opened to their guests. Construction started on the 2nd floor and was completed on a floor by floor basis to complete this phase of the project at the 5th and final floor.
The waterfront property boasts a fresh new look in their Guest Suites with hardwood floors throughout the living areas, bedrooms, and dinning areas, new stone tile floors and walls in the bathrooms, custom casework and countertops, new wall-hung sliding doors, designer wall and window coverings, and sheik furniture and light fixtures to make these modern rooms flourish.
Moving from floor to floor, the corridors have been retrofitted with new carpet, Cintiva flooring tiles at the elevator lobbies, new wall coverings, custom art decals, unique art pieces, an extensive amount of finish carpentry trim work, and decorative lighting.